Background: In the context of the negotiations on the 2024 WIM review and joint report of the WIM ExCom and the Advisory Board of the Santiago Network on Loss and Damage (SNLD), the question has arisen as to whether a single decision could address these two agenda items. In the past, outcomes on the WIM […]
Blog Archives
Query: Can paragraph 5 of the Decision adopted at CMA 6 on the NCQG (the “Decision”)[1] be interpreted as meaning that “loss and damage” contributions in Nationally Determined Contributions (“NDCs”) will be supported? For example, Vanuatu has costed their Loss and Damage contributions in their NDC.[2](“Query 1”); and The FRLD is an operating …
…
Query:
Query: How important is it that the issue finance for loss and damage has been placed on the current provisional agendas (item 8f) of both the COP27 and CMA4?